|
DUSLO a.s., Šala, Slovakia 2009 Steam boiler replacement at industrial waste incinerator
Turn-key delivery of new steam boiler after fluidized bed furnace at industrial waste incinerator. General contractor EVECO Brno.
|
![]() |
|
|
VL Servis, Vítkovice Cylinders, a.s., Czech republic 2007 Heating system for hardening and tempering furnace
Heating system for hardening and tempering furnace (about 100 burners) including flue gas exhaust and process control for thermal treatment of pressure bottles. General contractor EVECO Brno.
|
![]() |
|
|
SPP Bohemia a.s., Underground natural gas reservoir Dolní Bojanovice 2006 Increase of natural gas heating system capacity
Turn-key delivery of equipment for high-capacity natural gas heating system. General contractor EVECO Brno.
|
![]() |
|
|
VL Servis, Vítkovice Cylinders, a.s., Czech republic 2006 Heating roll furnace revamp
Burner system replacement including flue gas exhaust and process control.
|
![]() |