Energetické využití odpadů

SCHENCK PROCESS, ČESKOMORAVSKÉ VÁPNO, Mokrá, a.s., Czech Republic, 2003 Design and delivery of special feeding burner fired with alternative fuels for lime works application. Supplier of burner with accessories: EVECO Brno.
Municipal waste incinerator plant, SAKO Brno, a.s., Tenza, a.s., Czech Republic, 2008-2011 Providing three the most important experts (for boilers K2 and K3; technological processes, measurement – regulation and control of technological processes...
SCHENCK PROCESS, Plzeňská teplárenská, a.s., Plzeň, Czech Republic, 2009 Turn-key delivery of solid alternative fuel feeding nozzles with accessories on coal fired boiler in the Plzeň Heating Plant.
TERMIZO, a.s., Liberec, Czech Republic, 2013 Execution of project in scope of: design and calculations of equipment, construction and vendor documentation, manufacturing of equipments, equipment test, dismantling of old equipment and installation...
TERMIZO, a.s., Liberec, Czech Republic, 2003 Delivery of dioxin filter for the Liberec MSW incinerator. Application of the catalytic-filtration system REMEDIA D/F (manufacturer W. L. Gore & Associates). General contractor EVECO Brno.
MOL Group - Slovnaft, a.s., Bratislava, Slovakia, 2006 Turn-key delivery of industrial sludge incinerator in the Slovnaft refinery. New burner system, heat utilisation, flue gas cleaning system, ash and fly ash management. General contractor EVECO...
BIOCEL, a.s., Paskov, Czech Republic, 2000 Complex revamp and modernization of the largest industrial waste incinerator in the Czech Republic. General contractor EVECO Brno.
Due to the current objectives plan of waste management of the Czech Republic, which provides specific measures for waste treatment in the Czech Republic, we come up with a modern concept of up-to-date waste-to-energy plants with small and medium...