Replacement of K8 boiler flue gas fan

Replacement of K8 boiler flue gas fan

VEOLIA Energie Kolín, a.s., Kolín, 2015

Replacement of existing flue gas fan designed on maximal boiler capacity at 110t/h by new flue gas fan designed for maximal boiler capacity of 130 t/h a related equipment.

Scope of project: design of equipment, project documentation, delivery , delivery of equipment, removal of existing equipment and installation of new ones; equipment test and commissioning.

General contractor EVECO Brno.

Replacement of K8 boiler flue gas fan
Replacement of K8 boiler flue gas fan