Extension of the air-exhaust-suction system for supply to the boiler K2

Extension of the air-exhaust-suction system for supply to the boiler K2

MITAS, a.s., Praha, 2015

Extension of the existing contaminated-air-suction technology designed and supplied by our company in 2008 for supply to the boiler K2. Hydrocarbon-contaminated air is sucked from the production area and subsequently used as combustion air for a new boiler K2.

General contractor of the project: EVECO Brno. 

Extension of the air-exhaust-suction system for supply to the boiler K2
Extension of the air-exhaust-suction system for supply to the boiler K2