Desulphurization

DeSOx

In present many operators of coal-fired boilers ...

MORE

Waste to Energy

EVELINE

Due to the current objectives plan of waste ...

MORE

Cleaning of exhaust and flue gases

We offer several types of exhaust and flue gas ...

MORE

Dioxins/Furans

DeDiox

We offer a modern catalytic filtration system to destroy ...

MORE

VIEW NEXT TECHNOLOGIES +

Welcome

Company EVECO Brno is your partner and supplier of reliable, economic and environmentally friendly technical solutions for:

  • waste-to-energy
  • biomass boilers
  • flue gas and off-gas cleaning
  • burner systems
  • plant revamp and retrofitting

Newsletter

References

Disposal of waste gas in district heating boilers
MITAS, a.s., Zlín, Czech Republic, 2011-2012 Turn-key delivery of technology for waste gas disposal in district heating boilers, i.e. technology for extraction of air polluted by hydrocarbon...
Increase of natural gas heating system capacity
SPP Bohemia a.s., Underground natural gas reservoir Dolní Bojanovice, Czech Republic, 2006 Turn-key delivery of equipment for high-capacity natural gas heating system. General contractor EVECO...
Baghouse filter revamp at coal-fired boiler
SPOLANA, a.s., Neratovice, Czech Republic, 2008, 2012 Turn-key delivery of new filtration system. Revamp of existing equipment and delivery of new equipment. General contractor EVECO Brno.
Overall reconstruction of fire testing furnace
PAVÚS, a.s., Praha, 2002                   Overall reconstruction of fire testing furnace related with replacement of burner and control system of...
Reduction of pressure drop of the REMEDIA D/F catalytic-filtration system
AVE Kralupy, s.r.o., Kralupy nad Vltavou, 2018 Revitalization of the GORE® REMEDIA® D/F catalytic-filtration system installed at the Medical and Hazardous Waste Incineration plant AVE Kralupy, s.r.o...
Revamp of combustion air supply for heating plant boilers
MITAS, a.s., Praha, 2008 Utilization of air polluted by hydrocarbons which is sucked out of the production halls as a combustion air for heating plant boilers. Order realization from project to...
Spalovna průmyslových kalů
MOL Group - Slovnaft, a.s., Bratislava, Slovakia, 2006 Turn-key delivery of industrial sludge incinerator in the Slovnaft refinery. New burner system, heat utilisation, flue gas cleaning system,...
Prototype of up-to-date technological unit for combustion of different types of biomass with capacity of 1 MW
Czech republic – administrative part of Ministry of Industry and Trade, Czech Republic, 2008 EVECO Brno, in cooperation with a group of Czech companies VHS Brno, a.s., PROMET, Romill s.r.o. and...
VEOLIA Energie Czech Republic, a.s., RSEM, Power plant Třebovice, Ostrava, 2014 Turnkey delivery of technology for reduction of SO2 at hot-water boiler K2 in power plant Třebovice. Technology DeSOx...
Optimization of government support for electricity produced from wastes in order minimizes the influence of electricity on the end user
Ministry of industry and Trade (MPO) – Program EFEKT, 2010 - 2011 State program based on support energy savings and utilization of renewable sources of energy for year 2011. Assessment of energetic...
Construction of modern facility for energy utilization of industrial, hospital and municipal waste generated in canton Yangon
Czech developement agency, Program B2B-A, Feasibility study, 2017 Analysis of the integration suitability  of EVECONT modular unit for energy utilization of hospital, industrial and municipal...
Special feeding burner for alternative fuels
SCHENCK PROCESS, ČESKOMORAVSKÉ VÁPNO, Mokrá, a.s., Czech Republic, 2003 Design and delivery of special feeding burner fired with alternative fuels for lime works application. Supplier of burner...
Reduction of NOx and SO2 Emissions in Třebovice Power Station  on K13 and K14 Boilers
DALKIA Česká republika, a.s., Třebovice Power Plant, Ostrava, Czech Republic, 2010 Turn-key delivery of equipment for reduction of NOx and SO2 emissions on coal fired boilers K13 and K14 in...
Filtration-catalyst system REMEDIA D/F®
SLOVNAFT a.s., Industrial waste water treatment center MCHB ČOV, Slovakia, 2015 Delivery and installation of catalyst filtration system GORE® REMEDIA® D/F which integrates in one unit...
Heating roll furnace revamp
VL Servis, Vítkovice Cylinders, a.s., Ostrava - Vítkovice, Czech Republic, 2006 Burner system replacement including flue gas exhaust and process control. General contractor EVECO Brno.
Primary and secondary measures for reduction of NOx emissions on coal-fired boilers K1 and K3 ČSM North - phase  I/b and II/a
Customer: AmpluServis, a.s., Elektrárenská 5558, 709 74 Ostrava – Třebovice Operator: Veolia Industrial Services CR, Inc., ČSM mine, plant North, Stonava, 2015 General design of technology,...
Evaluation energy and economic effectivity of waste to energy technologies applicable in conditions of Czech republic
Ministry of industry and trade – Program EFEKT, 2014-2015 Government program for support of energy savings and renewable resources utilization for year 2014 Analysis of waste incinerator...
Heating system for RCO unit
ELVAC Ekotechnika, VARROC LIGHTING SYSTEMS s.r.o., Šenov u nového Jičína, 2016                                ...
Industrial waste incinerator
BIOCEL, a.s., Paskov, Czech Republic, 2000 Complex revamp and modernization of the largest industrial waste incinerator in the Czech Republic. General contractor EVECO Brno.
Optimization of amount of government support for electricity produced from biomass in order to minimize the influence of electricity price on the end user
Ministry of industry and Trade (MPO) – Program EFEKT, 2010-2011 State program based on support energy savings and utilization of renewable sources of energy for year 2011 Assessment of energetic...