Desulphurization

DeSOx

In present many operators of coal-fired boilers ...

MORE

Waste to Energy

EVELINE

Due to the current objectives plan of waste ...

MORE

Cleaning of exhaust and flue gases

We offer several types of exhaust and flue gas ...

MORE

Dioxins/Furans

DeDiox

We offer a modern catalytic filtration system to destroy ...

MORE

VIEW NEXT TECHNOLOGIES +

Welcome

Company EVECO Brno is your partner and supplier of reliable, economic and environmentally friendly technical solutions for:

  • waste-to-energy
  • biomass boilers
  • flue gas and off-gas cleaning
  • burner systems
  • plant revamp and retrofitting

Newsletter

References

Implementation of the latest available technologies in incineration plant of company SPORTEN, a.s. – 4-D FILTRATION
SPORTEN a.s., Waste incineration plant, Nové Město n. Moravě, Czech Republic, 2011 Turn key delivery (upgrade) of incineration plant flue gas cleaning technology in SPORTEN, a.s. company, Nové...
Extension of the air-exhaust-suction system for supply to the boiler K2
MITAS, a.s., Praha, 2015 Extension of the existing contaminated-air-suction technology designed and supplied by our company in 2008 for supply to the boiler K2. Hydrocarbon-contaminated air is...
Industrial waste incinerator
BIOCEL, a.s., Paskov, Czech Republic, 2000 Complex revamp and modernization of the largest industrial waste incinerator in the Czech Republic. General contractor EVECO Brno.
Specialized thermooil system for industrial sludge incinerator
MOL Group – Slovnaft, a.s., Bratislava, Slovak Republic, 2006 During realization of sludge incinerator was designed, delivered and put to operation thermooil system which includes tailored flue gas/...
Primary and secondary measures for reduction of SOx and NOx emissions on coal-fired boilers K1 and K3 ČSM Sever - phase II/b.
Client: VEOLIA Průmyslové služby ČR, a.s., Důl ČSM, závod Sever, Stonava 2015 Turnkey delivery of technology for reduction of SO2 emissions in boilers K1 and K3 with rated steam output of 50.0 t/h...
Optimization of government support for electricity produced from wastes in order minimizes the influence of electricity on the end user
Ministry of industry and Trade (MPO) – Program EFEKT, 2010 - 2011 State program based on support energy savings and utilization of renewable sources of energy for year 2011. Assessment of energetic...
Technical supervision expert team during reconstruction of SAKO Brno municipal waste incineration plant
Municipal waste incinerator plant, SAKO Brno, a.s., Tenza, a.s., Czech Republic, 2008-2011 Providing three the most important experts (for boilers K2 and K3; technological processes, measurement –...
VEOLIA Energie Czech Republic, a.s., RSEM, Power plant Třebovice, Ostrava, 2014 Turnkey delivery of technology for reduction of SO2 at hot-water boiler K2 in power plant Třebovice. Technology DeSOx...
Heating system of RCO unit
ELVAC Ekotechnika, JUTA, a.s., Dvůr Králové nad Labem, Czech Republic, 2014 Design and delivery of heating system for regenerative oxidation catalytic  - type S-6.0. General contractor of...
Filtration-catalyst system REMEDIA D/F®
SLOVNAFT a.s., Industrial waste water treatment center MCHB ČOV, Slovakia, 2015 Delivery and installation of catalyst filtration system GORE® REMEDIA® D/F which integrates in one unit...
Primary and secondary measures for reduction of NOx emissions on coal-fired boilers K1 and K3 ČSM North - phase  I/b and II/a
Customer: AmpluServis, a.s., Elektrárenská 5558, 709 74 Ostrava – Třebovice Operator: Veolia Industrial Services CR, Inc., ČSM mine, plant North, Stonava, 2015 General design of technology,...
Prototype of up-to-date technological unit for combustion of different types of biomass with capacity of 1 MW
Czech republic – administrative part of Ministry of Industry and Trade, Czech Republic, 2008 EVECO Brno, in cooperation with a group of Czech companies VHS Brno, a.s., PROMET, Romill s.r.o. and...
Heating roll furnace revamp
VL Servis, Vítkovice Cylinders, a.s., Ostrava - Vítkovice, Czech Republic, 2006 Burner system replacement including flue gas exhaust and process control. General contractor EVECO Brno.
Effective treatment of hospital waste in Zenica Cantonal Hospital
Czech developement agency – Program B2B – Feasibility study, 2017 Technical-economic analysis of the integration suitability of the technological unit for thermal treatment of hospital waste in...
Dioxin filter
TERMIZO, a.s., Liberec, Czech Republic, 2003 Delivery of dioxin filter for the Liberec MSW incinerator. Application of the catalytic-filtration system REMEDIAâD/F (manufacturer W. L. Gore &...
Special feeding burner for alternative fuels
SCHENCK PROCESS, ČESKOMORAVSKÉ VÁPNO, Mokrá, a.s., Czech Republic, 2003 Design and delivery of special feeding burner fired with alternative fuels for lime works application. Supplier of burner...
Limestone furnace dedusting
SKW Metallurgy Sweden AB, Sundsvall, Sweden, 2012 Design and turn-key delivery of technology for dedusting of off gases coming from limestone production line. Design and delivery of main equipments...
Construction of modern facility for energy utilization of industrial, hospital and municipal waste generated in canton Yangon
Czech developement agency, Program B2B-A, Feasibility study, 2017 Analysis of the integration suitability  of EVECONT modular unit for energy utilization of hospital, industrial and municipal...
Special heat exchangers - reboilers
MOL Group - Slovnaft, a.s., Bratislava, Slovakia, 2017   In the framework of fixing the unit for atmospheric distillation of petroleum products, the system with two heat exchangers –...
Delivery and installation of air preheater
TERMIZO, a.s., Liberec, Czech Republic, 2013 Execution of project in scope of: design and calculations of equipment, construction and vendor documentation, manufacturing of equipments, equipment...